« Back to Events

NHDOT Bridge Program Update & North Washington St. Bridge Replacement
1/17/2019
Presentation 1: Find out what has been going on at NHDOT and what is on the horizon.
Presentation 2: This presentation describes the design and construction of a signature bridge project located in the center of Boston that carries North Washington Street over the Boston Inner Harbor. The 1400’ long multi-span bridge structure links the Boston North End to Charlestown and is located near the TD Garden and the Zakim Bridge. The proposed bridge is owned by the City of Boston and will carry four lanes of vehicular traffic, a designated bus rapid transit lane, separated bike lanes, full length curbside plantings with irrigation, 10’-6” wide sidewalks on both sides with observational sidewalk build-outs over the navigation channel, architectural trellises and accent lighting above and below the bridge. This $177 million project also includes a 1000’ long temporary vehicular/pedestrian bridge extending across the harbor to maintain traffic, a separate 800’ long temporary utility bridge, and a 300’ long multi-span walkway bridge under the main structure. The project is now under construction and is scheduled to be completed in the fall of 2023.

Location: Grappone Conference Center
70 Constitution Avenue
Concord, NH  03301
Download File: SENH January 2018 Meeting Announcement.pdf – SENH January Meeting Announcement
Web Address: SENH Meeting Calendar
Contact: Cassi Beroney
603-554-6324